Saturday, 1 Apr 2023
MRMWR completes road projects in South Sharqiyah

MRMWR completes road projects in South Sharqiyah

MRMWR is also enhancing the efficiency of its human cadres to preserve pace with the needs of extensive improvement and to switch to electronic solutions in different places of municipal and water function.

The most essential projects that have been implemented are the completion of internal road paving projects in South Sharqiyah. In addition, it has also established paved parking slots with a total region of 15,000sq m.

In Jalaan Bani Bu Ali, MRMWR paved roads with a total length of 71km in addition to parking lots with a total region of 20,000sq m.

In Jalaan Bani Bu Hassan, internal roads had been paved in different areas with a total length of 68km and parking spaces with an region of 15,000sq m.

In the wilayat of Al Kamil W’Al Wafi, pavement of roads with a total length of 51km and parking slots with a total region of 15,330sq m is beneath way.

The ministry represented by the Directorate General of Regional Municipalities and Water Resources in South Sharqiyah governorate is also finishing its solutions and beautification projects in Sur in cooperation with the private sector. These projects consist of the building of 3 playgrounds for kids with the assistance of Oman LNG.

The directorate also carried out important projects such as the provide and installation of modern day irrigation method for trees in public places in Jalaan Bani Hassan. It is also functioning on projects to set up water and sewage pipes.

Information Source: Muscat Daily

Check Also

Face masks out of stock in Muscat pharmacies

Pharmacies in 19 currently sweeping the world.